“Steve from Select Electrical Solutions did an excellent job re-wiring my house. I couldn't recommend him more. Very professional and personable team.”
Darcy J.
Google review
House Rewires
Licensed, REC 33978 5.0 from 127 Google reviews
steve@selectelectricalsolutions.au
Some Doncaster homes from the 1960s are due a look at the cabling. House rewiring is worth discussing if your home is still on original circuits.
Doncaster 3108
Brick homes of the 1960s and 1970s were generally built sturdily, and in Doncaster they are often large. The wiring has done a lot of work over the decades, particularly in places that have been extended or altered. We sometimes find old wiring in the roof space with cracked insulation, joints made by earlier owners and circuits that cover too much floor area. A rewire replaces the cable, board and outlets, bringing the house up to current standards. On a large house, the job is staged: you might do the main living areas first and the rest later. Rebuilt two-storey homes have newer wiring in the new part and old wiring in the retained part, and joining them properly matters. We inspect before recommending anything. If a partial rewire is enough, we will say so and plan around what you need.
What the job involves, warning signs and what's included are on our main house rewires page. For everything else we do locally, see electrician Doncaster.
Good work. Happy locals.
5.0 from 127 Google reviews
“Steve from Select Electrical Solutions did an excellent job re-wiring my house. I couldn't recommend him more. Very professional and personable team.”
Darcy J.
Google review
House Rewires
“Steven was very easy to deal with. He returned calls and followed up in a timely manner. He was thorough and explained things clearly. He got the job done quickly and without hassle. Recommend him with no hesitation. Thanks again Steve. Will use again.”
Tony & Connie
Google review
FAQ
Can't see your question? Call Steve on 0450 347 495.
Not necessarily. We inspect both parts and the connections between them. Often the original section is the one that needs attention, and we can rewire that part while leaving the newer wiring in place. We explain each stage in plain terms before we begin.
Free quote
Four quick details and Steve calls you back. No call centre, no obligation. Steve answers 8am to 9pm.